Summary
Overview
Work History
Education
Skills
Languages
Training
Practical Skills
Carrier Skills
Timeline
Generic
Sameh Hassan Mohamed

Sameh Hassan Mohamed

Alexandria

Summary

Dynamic E&I QC Team Leader with a proven track record at Belayim Petroleum Company, excelling in quality control and team collaboration. Expert in implementing advanced inspection techniques and enhancing operational efficiency. Adept at fostering communication across teams, ensuring compliance with industry standards, and driving project success through effective leadership.

Overview

21
21
years of professional experience

Work History

E&I QC Inspector

Apave
Abu Dhabi
09.2025 - Current
  • Conducted audits on production processes, identifying and addressing quality issues.
  • Inspected materials for compliance with quality standards and specifications, contributing to overall product reliability.
  • Documented inspection results and maintained accurate records of quality assessments to support continuous improvement efforts.

E&I QC Team leader

Belayim Petroleum Company
10.2022 - 08.2025
  • Led e&i QC team for Zohr gas field development project, ensuring quality standards in onshore plant phases.
  • Coordinated quality control processes, achieving compliance with industry standards and enhancing project integrity.
  • Oversaw implementation of new meg regeneration units, improving operational efficiency across the project.
  • Streamlined communication between cross-functional teams to facilitate project progress.

E&I QC Team leader

Hassan Allam Construction
10.2021 - 10.2022
  • Led quality control team for upgrades at Elarish Simple Cycle Power Plant, two units of 125 MW each.
  • Oversaw implementation of performance enhancements, resulting in optimized power generation efficiency.
  • Coordinated with engineering teams, ensuring compliance with industry standards and regulations for successful project execution.
  • Conducted thorough inspections and testing, verifying operational integrity and reliability following upgrades.

E&I QC Team leader

Carlo Gavazzi Egypt
05.2021 - 10.2021
  • Led quality control team during expansion project, increasing refinery capacity from 100,000 to 160,000 barrels per day, enhancing overall production capacity.
  • Oversaw upgrades to fuel quality, achieving compliance with future Euro 5 specifications, ensuring product quality and regulatory adherence.
  • Managed allocation of 2.3 billion USD for project execution and resource optimization, maximizing return on investment and streamlining resource use.

E&I QC Team leader

ENOIA S.A.
03.2020 - 05.2021
  • Led E&I QC team for Canal Sugar Beet Factory project, maintaining high-quality standards and compliance with industry regulations.
  • Oversaw development of advanced beet sugar facility, achieving daily reception capacity of 48,000 tons while ensuring operational readiness.
  • Led quality control inspections for petroleum products and processes.
  • Developed and implemented quality assurance procedures across operations.
  • Trained team members on quality standards and safety protocols.

Fire Protection Commissioning

GS Engineering Construction
04.2019 - 03.2020
  • Managed projects investing 4.3 billion USD in advanced technology, ensuring successful integration of fire protection systems.
  • Conducted fire protection commissioning for operations at a 4.7 million tons/year refinery.
  • Ensured compliance with safety regulations during commissioning, contributing to safe operational readiness.
  • Collaborated with engineering teams to implement effective fire protection measures, enhancing overall safety protocols.

E&I QC Inspector

GS Engineering Construction
04.2016 - 04.2019
  • Performed quality inspections for equipment and installations in refinery, ensuring adherence to specifications.
  • Ensured compliance with industry standards and specifications during project execution.
  • Collaborated with engineering teams to identify and resolve quality issues promptly.
  • Conducted inspections and audits to confirm adherence to procedural guidelines, enhancing overall quality assurance processes.
  • Verified accuracy and completeness of documentation prior to project delivery, supporting compliance with industry standards.
  • Monitored processes to uphold safety and environmental regulations throughout operations.
  • Trained personnel on quality control standards and best practices.
  • Supported continuous improvement initiatives to enhance operational efficiency.

Construction Engineer

Watania Group Co.
11.2004 - 04.2016
  • Oversaw execution of projects at Egyptian Liquefied Natural Gas (ELNG) and Egyptian Linear Alkyl Benzene Co. (ELAB) to meet operational goals.
  • Managed quality assurance processes to ensure compliance and safety at Khalda Petroleum Co. (KLC) and Misr Petroleum Co.
  • Conducted quality control for construction, commissioning, and maintenance of firefighting systems and fire alarms at multiple sites.
  • Supervised installation and maintenance of firefighting systems at Egyptian Natural Gas Holding Co. (EGAS).
  • Led inspections and compliance checks at Alexandria Container Company in Alex Port.
  • Ensured adherence to safety standards at Egyptian Petrochemicals Co.
  • Coordinated with stakeholders to facilitate timely project completion across all sites, enhancing collaboration and communication.

Education

B.Sc. of electronic & control - Industrial Electronic and Control

Monofia
01-2004

Skills

  • Quality control inspection
  • Testing and documentation
  • Electrical calibration inspection
  • Continuity insulation testing
  • Cable laying operations
  • Transformer cable checks
  • Battery lighting checks
  • Fiber optic testing
  • Motor testing preparation
  • Fire alarm supervision
  • Telecom installation reviews
  • Installation supervision
  • Project management safety
  • Primavera P6 proficiency
  • Microsoft Office suite
  • Internet applications expertise
  • Team collaboration
  • Leadership and supervision
  • Communication and interpersonal
  • Telecom installation reviews

Languages

  • Arabic
  • English

Training

  • Program of Primavera P6, The Arab Academy for science, Technology & Maritime Transport, 40 Hours
  • Installation and programming AFP-400, AFP-1010 AM-2020, RP1002, Watania for Construction & Engineering Co., Two weeks
  • Installation and programming ONYX control panels: NFS-320, NFS2-640, NFS2-3030, NCA, DVC, Notifier by Honeywell, Dubai U.A.E, Three weeks
  • Installation and programming Gent System 8000 intelligent control panels, Watania for Construction & Engineering Co., Two weeks
  • Installation and programming ONYX control panels: NFS-640, NFS-3030, NCA, Notifier by Honeywell, Dubai U.A.E, Two weeks
  • Installation and programming Simplex intelligent control panels, Tyco safety products, Abu Dhabi U.A.E, Two weeks
  • Installation and programming ONYXWORK, Notifier by Honeywell, Dubai U.A.E, Three weeks

Practical Skills

  • Performs the specific inspections on equipment, materials construction/installation activities at site
  • Plan and supervise subcontractor inspection activities and reviews of subcontractor QC performance
  • Checks cable laying and cable identification
  • Performs punch-list operations
  • Checks power transformers, switch board, accumulator battery, sockets outlet, lighting system, earthing system
  • Performs visual inspections, dimensional test, checks rating and material for connection
  • Performs tests of continuity, insulation resistance
  • Performs tests functional electrical production
  • Checks fiber optic cable
  • Performs test communication functionalities
  • Witness the tests, controls and inspections carried out
  • Check conformity with the quality control plan, obtain the relevant documentation, and check procedures and equipment to be used in tests, controls and inspections, manage documents certifying tests, controls and inspections
  • Ensure the correct implementation of the approved inspection test plan
  • Responsibilities of electrical and instrument site inspection as per inspection test plan (ITP)
  • Checking, verification and testing of fabrication, construction and installation work performed by contractors/subcontractors in order to confirm that the applicable rule, code and standard are being met and that the project requirements on the design drawing specification
  • Perform test of HI-POT
  • Inspect interconnection and termination installation
  • Witnessing the pre-commissioning test and other tests if any
  • Prepare and maintain the inspection test report
  • Prepare, review and compile the dossier for electrical and instrument
  • Perform test of motor solo run
  • Instrument Calibration (PT, PDT, FT, LT, TT, TE, control valve and ON/OFF valve)
  • Installation & construction supervision for all the field instrument (transmitters, switches, valves, indicators…etc.) installation works
  • Preparation of instrument index according to vendor P&ID
  • Performance test for deluge system
  • Installation & construction supervision for the fire alarm system (system cabinet and marshalling cabinet) at control room
  • Installation & construction supervision for all electrical and cable works (trenches, trays, pulling, laying, glanding, connection and termination)
  • Installation & construction supervision for all the field junction boxes installation work
  • Installation & construction supervision for all F&G detector (Gas, Hydrogen and UVIR detectors)
  • Testing, commissioning and start-up for local fire control panel (LFCP)
  • Installation telecommunication system
  • Installation & construction supervision for all the field instrument installation works

Carrier Skills

  • Demonstrate familiarity with related documentation, drawings and systems
  • Supervisory and good communication skills
  • Good leadership and interpersonal skills and the ability to work as a team member under project schedule
  • Pertinent national and international standards
  • Work processes leading to site acceptance testing and mechanical completion of facilities

Timeline

E&I QC Inspector

Apave
09.2025 - Current

E&I QC Team leader

Belayim Petroleum Company
10.2022 - 08.2025

E&I QC Team leader

Hassan Allam Construction
10.2021 - 10.2022

E&I QC Team leader

Carlo Gavazzi Egypt
05.2021 - 10.2021

E&I QC Team leader

ENOIA S.A.
03.2020 - 05.2021

Fire Protection Commissioning

GS Engineering Construction
04.2019 - 03.2020

E&I QC Inspector

GS Engineering Construction
04.2016 - 04.2019

Construction Engineer

Watania Group Co.
11.2004 - 04.2016

B.Sc. of electronic & control - Industrial Electronic and Control

Monofia
Sameh Hassan Mohamed