Experienced and results-driven Project Manager with over 17 years in the construction industry, specializing in large-scale residential, commercial, and healthcare projects. Skilled in budgeting, scheduling, and on-site coordination with a strong focus on cost control and performance tracking. Fluent in English, advanced in Russian, with working knowledge of German and Spanish. Seeking to leverage international project management experience in the UK construction sector.
Within last 6 years i have been working in Moscow, i have coordinated 5 different unique projects:
*Smorodina Apart Hotel Project / 15.000m2, Skolkova / Moscow, RUSSIA (ongoing)
*International Medical Cluster Multifunctional Medical Center, International Medical Cluster. Operating and Intensive Care Building / 13.000m2, Skolkova / Moscow, RUSSIA
(ongoing)
*International Medical Cluster, Multifunctional Medical Center for Chronic Diseases Project / 14.300m2, Skolkova / Moscow, RUSSIA (ongoing)
*International Medical Cluster Multifunctional Medical Center / 54.000m2, Skolkova / Moscow, RUSSIA (ongoing)
*Medical Cluster Project, Therapy Center / 28.000m2, Skolkova / Moscow, RUSSIA (finished)
*Lujniki Multifunctional Aquacenter Project / 50.000m2, Moscow, RUSSIA (finished)
Area of responsibilities;
• Controlling the preparation of management plans, budget, construction work plans and revisions of them.
• Monitoring the realized budget, schedules and reports work efficiency and financial cash flow charts.
• Making optimizations on budget to decrease the cost of project, and to increase the profitability.
• Managing the on-site works, giving work orders and controlling the production quality on site by daily.
• Examining the projection for the end of project, determining the potential defects and taking precautions before they occurred.
• Controlling and approving the material supplying plans, machinery-equipment costs.
• Keeping up the coordination and communication between different disciplines of the project, in order to manage the project activities regular and fast way.
• Controlling the advance payment reports regularly for each quartal to the client within the proper of the contract and the company’s rights.
• Auditing the site within the compass of Health and Safety Regulations.
• Coordinating the tender prosses and examining the tender documents.
• Choosing the best suitable sub-contractors or suppliers for project and giving the preliminary approval for tender.
Queen Central Park Bomonti, Residence Project
Istanbul, TURKEY
*1.095 flats, 58 floored residence construction
Area of responsibilities;
• Carried out the whole activities and systems in project according to management policies specified by the board of company.
• Controlled the preparation of management plans, budget, construction work plans and revisions of them. Monitored the realized budget, schedules and reports based on man-hour efficiency and financial cash flow charts.
• Examined the projection for the end of project, determined the potential defects and taking precautions before they occurred.
• Controlled and approved the project organization chart, material supplying plans, machinery-equipment programs composed by the contractors.
• Planned, monitored and reported the audition of QA/QC system to the board.
• Kept up the coordination and communication between different disciplines of the project, in order to manage the project activities regular and fast way.
• Organized the coordination between the contractors and the government effectively to provide a wellcommunicated work, and also made information flow between the board and the site.
• Managed and planned the relations between the contractors and the consultant.
• Tracked, assessed and approved the progress payments within the proper of the contract and the company’s rights.
• Requested when needed, tests for the construction materials which are used in project and examining the results.
• Controlled the site that the latest design projects are being used in.
• Audited the site within the compass of Health and Safety Regulations.
• Solved the issues that might occur during the production urgently.
• Examined tender documents and choosing the best suitable contractor for project and gave the preliminary approval for tender.
• Organized correspondences and made comparison charts for new subcontractors.
Krasnodar Arena Stadium Project Krasnodar, RUSSIA
(35.000 Capacity Stadium Project)
Area of responsibilities;
• Prepared Interim Payment Certificates and got approval from the Employer, organized the preparation of subcontractors Payment Certificates.
• Checked and approved subcontractors’ monthly progress payments.
• Prepared unit price analyses, additional policies and submitted to client for approval.
• Monitored the progress rate for the subcontractors by considering realised manhours.
• Casted up the realized costs, and compared with the planned costs for all works.
• Coordinated with account office for monthly budget analysis and forecasts.
• Prepared and calculated Cash-Flow documents.
• Computed and prepared tender documents.
• Organized correspondences and made comparison charts for new subcontractors.
Ayvazovsky Hotel Project Sochi, RUSSIA
(Sochi Olympic Village Area 7 floored, turn-key Hotel Project; 3.700 m2 site are, totally 20.237 m2 area of usage)
Area of responsibilities;
• Prepared daily, weekly and monthly progress reports by coordinating the information process between site workers, subcontractors and suppliers.
• Organized and regularly updated project planning schedule.
• Created and regularly updated the material procurement follow-up system.
• Monitored the progress rate for the subcontractors by considering realized manhours.
• Prepared general contractor monthly progress payments and submitted to client for approval.
• Checked and approved subcontractors’ monthly progress payments.
• Coordinated with account office for monthly budget analysis and forecasts.
• Prepared unit price analyses, additional policies and submitted to client for approval.
İstanbul Otogar-Bağcılar-Olimpic Village-Başak Konutları-4 Railway System, Bağcılar Station
(Built with top-down construction method)
Area of responsibilities:
• Organized subcontractors’ site works, gave work orders and controlled the production quality on site by daily.
• Prepared daily, weekly and monthly progress reports by coordinating the information process between site workers, subcontractors and suppliers.
• Prepared general contractor monthly progress payments and submitted to client for approval.
• Checked and approved subcontractors’ monthly progress payments.
• Monitored the total procurement process.
• Prepared unit price analyses, additional policies and submitted to client for approval.
• Organized and regularly updated project planning schedule.
Shangri – La İstanbul Hotel Project Istanbul, Turkey
(Built with top-down construction method)
Area of responsibilities;
• Worked as Site Chief; organization of subcontractors in the field and set up daily job orders.
• Managed procurement process from construction site and ordering supplies.
• Prepared monthly progress payment applications both for the contractor and the subcontractors.
• Regulated the new unit price analyses and prepared additional policies.
• Prepared and regularly updated project planning schedule.
• Organized the process of investigation new subcontractors.
• Attended regular progress meetings with the client and subcontractors to analyze work progress.
Kadikoy– Kartal Railway System,
Kadikoy Station Istanbul, Turkey
(built with top-down construction method)
Area of responsibilities;
• Prepared monthly progress payment applications both for the contractor and the subcontractors.
• Regulated the new unit price analyses and prepared additional policies.
• Organized and regularly updated project planning schedule.
• Followed up new tenders and produced tender documentations.
• Attended regular progress meetings with the subcontractors to analyze work progress.
Istanbul Metropolitan Municipality İ.E.T.T Topkapı-Edirnekapı Railway Transportation System Istanbul, Turkey
Area of Responsibilities;
• Worked as Field Engineer specially based on field constructions.
• Worked as Site Chief; organization of subcontractors in the field, preparation of daily and weekly reports to the project manager, calculation and checking subcontractor’s and contractor’s monthly progress payments.
• Managing procurement process from construction site and ordering supplies.
• Revised as-built projects by getting the information from the field for progress payments.
• Worked on the calculation of final account, and price analyzing.
• Gave information to the government’s control commissioners on investigation search on the construction area.
DLH Istanbul MARMARAY Rail Tube Tunnel and Commuter Rail Mass Transit System Istanbul, Turkey
*Experienced as a control engineering trainee in Marmaray Rail Tube Tunnel and Commuter Rail Mass Transit System.
UNIVERSAL STUDIOS, Hollywood ,
*Have found a chance to learn different cultures with working about 4 months in Universal Studios Hollywood Customer Services, "the Summer Internship Programme".