
Run air tubing too valve , run tubing to instruments , installed and fabricated stands from instruments , stroke valves for testing, leak testing on instrumentation . work on ready engineering drawings to make sure instruments were installed on the rigth location, Working with Qc selling systems
Coordinated with crews and foremen to execute engineering designs precisely , maintaining high standards of quality and safety
Pull wire , rand conduits, perfomed terminations on i/o cabinets , also did some instrumentation work run some tubing , Installed some instruments stands.Run cable trays also instrument tubing trays