Resumen profesional
Datos destacados
Experiencia
Enfatiza tus habilidades clave
Cronología
Generic

Jorge David González Montero

Resumen profesional

Solar/ BESS Electrician with 5 years experience in the construction industry.

Skilled Journeyman Electrician with expertise in layouts, installations and rough-in work. Familiar with fixtures and customer preferences.

Datos destacados

6
6
years of professional experience

Experiencia

Journeyman Electrician

PCL Construcction
Dallas, Texas
02.2024 - 11.2025

Install Combiner boxes

Running ground rings

Install supports for the inverters

Install conduit

Pull DC and AC wire

Terminations on DC wire couple months

Phone and meg AC and AC wire

Get 3m certified for spliceing and terminate to 35kv

Then star terminations on AC wire on medium voltage

Doing VLF testings for the AC wire

And couple weeks on comissioning and punch list

Journeyman Electrician

Blattner Energy
Waco, Texas.
03.2023 - 01.2024

Running conduit

Running ground

Installing supports

Terminations on a battery station

Pull wire

Journeyman Electrician

Primoris Energy
Snyder, Texas.
10.2021 - 12.2022

Testing wire

Install conduit

Install supports

Medium voltage terminations on a battery station

Install cable tray

Terminating DC cables and inverters

Electrician

Greyco Solar
Utah, Cedar City
03.2021 - 09.2021

Terminate combiner boxes with compression lugs

Phone and meg DC wire

Install combiner boxes supports

Doing knockouts on the inverter plates

Pull 750 and 500 DC wire

Running conduit from inverters to DC trenches

Install pressure instruments

Test wire

Install and bend stainless steel tubing

Terminate the compressors

Terminate the PITs instruments

Working on the oilfield well heads

Install all the cable tray from the compressors to the wells

MV Terminator

Copper Mountain
Nevada, solar one de 64 mw.
11.2019 - 02.2021

Terminate medium voltage(2.4-35kv)Cables

VLF and Megger Test all terminations and installations

Follow all safety procedures in compliance with 70E

Doing terminations on the pole

Install ground on the seccional analizer box

Pull wire and install ground

Install Transformers and other electrical equipment

Run Hydro-Vac and prep jobsite for all installations


Enfatiza tus habilidades clave

Blueprint Reading

Electrical experience

Troubleshooting

Low voltage

NEC

Construction

Low voltage

Backhoe Operation

Electrical Experience

Pull Wire

Heavy equipment operation

Terminate

Cronología

Journeyman Electrician

PCL Construcction
02.2024 - 11.2025

Journeyman Electrician

Blattner Energy
03.2023 - 01.2024

Journeyman Electrician

Primoris Energy
10.2021 - 12.2022

Electrician

Greyco Solar
03.2021 - 09.2021

MV Terminator

Copper Mountain
11.2019 - 02.2021
Jorge David González Montero