Summary
Overview
Work History
Education
Skills
Construction Industry Positions
Personal Information
Computer Programmes Used
Cad Systems Used
Timeline
Generic

Jonathan Strauss

andover

Summary

Adept at leading BIM and MEP coordination with a proven track record at Skanska, I excel in leveraging Revit expertise and project planning to enhance design accuracy and efficiency. My approach combines meticulous documentation control with strategic Navisworks use, achieving significant project milestones while fostering collaborative team environments.

Overview

2025
2025
years of professional experience

Work History

BIM Coordinator\BIM Manager

Skanska
Slough
02.2022 - 06.2024
  • Stage 5 Design, Project Data Centre in Slough Coordination of MEP Services Modelling of Multi Service and Single Service Brackets, Ductwork & Containment Services.& Issuing of Drawings using Revit, , Naviswork Clash detection and addition of COBie Data
  • The Issue of Installation & Record Drawings for Mechanical, Electrical, Ventilation & Public Health Services

BIM Coordinator

Keysource Ltd
Crawley
05.2023 - 05.2024
  • Stage 5 Design, Project Refurishment of a Data Centre in Brussels Coordination of MEP Services Modelling of Multi Service and Single Service Brackets, Ductwork & Containment Services.& Issuing of Drawings using Revit, , Naviswork Clash detection
  • The Issue of Installation Drawings for Mechanical & Electrical services

MEP 3 CAD Coordinator

St Bart’s Hospital
London
05.2023 - 05.2024
  • Hospital (phase 1) full M&E Co-ordination including medical gases for Skanska
  • Project: Ropemarker
  • The production of Mechanical & Public Pipework Services
  • For areas including Boiler Room Chiller room Mid Basement AHU Rooms and all primary Mechanical & Public Health Risers, for Balfour Kilpatrick
  • Project Oxford University for Lonsdale’s Production of coordination models for the fit out on the project.

Ventilation Contractor

E Poppleton & Son’s Ltd
Cowlyn Bay
11.2021 - 01.2022
  • Position Ductwork Detailer Project Astra Zeneca, Ductwork Detailing of drawings for manufacture and changing from standard Revit families to Fabrication CAD components, numbering and dimensioning for manufacture.

MEP Revit Coordinator

RoyalHaskoningDHV
Birmingham
06.2021 - 10.2021
  • Project LHR11 a 6 floor Data Centre in Heathrow Electrical Containment Design Modelling for all electrical Services ie LV,Fire Alarm, Security,BMS & Data including tagging using Revit 2020
  • Also changes to Electrical Schematics which are also part of the 3D model

Senior BIM Manager/Coordinator

WBS Group Ltd
03.2020 - 05.2021
  • Project:- Data Centre Paris responsible for the BIM Modelling and Co-ordination of MEP Services in Revit MEP and changes to the Architecture, conversion of IFC’s to Revit models from Sub Contractors and creation of Revit link attachments and new families along with Asset tagging Equipment
  • Federating the model and issuing of Navisworks nwd files.

Senior Revit Coordinator

N G Baily
01.2019 - 03.2020
  • Project:-New Stadium for Brentford FC - Set Up Revit Central file for the Project including system names, levels, utilising templates standard and making new ones, adding in pipework systems & drawing sheet, Navisworks file
  • Produced the high level drainage & Rainwater for the south stand level 4 and started the ductwork
  • Moved to a new Project, called Woking Hotel – 3D model creation of the Risers – MEP Coordination.

Senior Revit Coordinator

PhoenixME
London
10.2018 - 12.2018
  • Battersea Power Station redevelopment Phase3A - Apartment Block PP1, PP2 & 0-1A Including 3 Centralised Basement levels - Electrical coordination and lighting layouts using Revit MEP 2018

BIM Manager

Imtech
01.2018 - 09.2018
  • Project:- 53 Storey Apartment Complex called The Madison in South Quay's London
  • Responsible for co-ordination and Drawing Production of all MEP Services by Sub contracted Revit/CAD Agency.

MEP BIM Manager/Coordinator

ESG Plc
02.2017 - 01.2018
  • 3D Revit MEP Co-ordinator & Project BIM Manager, Project:- 145 City Road – Mixed Commercial & Residential Tower blocks. MEP Risers, Plantrooms & Floor plates. Level of BIM is level 2, LOD is 350 & BIM Phasing of MEP services as we issue the model to the client. Standard Installation quality drawings

MEP Coordinator

NG Bailey
02.2016 - 03.2017
  • Projects Schools Design & Build, Production of Initial Design Drawings, followed by the Co-ordinated Installation Drawings showing all Services. For the Class room Floors, Risers and Plantroom.

Design Draughtsman

Philips Research Laborites
01.1985 - 03.2016
  • Duration 86 Projects: Control Boxes, Microwave Radar & Miniature TV’s
  • Description of work: To produce detailed Manufacturing drawings of Panel Design, Welded Frames, Plastic Moldings, & Machined Blocks.

3D Revit MEP Design Co-ordinator

Grontmij Building Services consultants Ltd (SWECO)
Maidenhead
09.2015 - 02.2016
  • Specialising in Public Health Drainage systems using both, Revit MEP & AutoCAD 2015 my position there was to input the Drainage Designs straight into Revit and Co-ordinate the Design with what the Architect wants and the M&E Services, Producing the Drainage & Rainwater schematics accordingly for Canary Wharf Projects A1 – 65 storey Apartment Building, A2 13 storey Apartment Building & A41 storey Apartment Building
  • Also the Production of Pods for the Bathrooms & showers for A1, A2 & A3 in Revit MEP.
  • Project: Underground Ventilation and Drainage Systems
  • Description of work: Design Detail and Manufacture of the suspended Booster Fans Platform for the Tunnels, used during Construction
  • This involved a complete Design including all Shear Force & Bending Moments Diagrams and Stress calculations
  • Also all details, assembly & Welded Frame Drgs
  • Source and procurement of materials including inspection prior to Installation/Assembly from the Crown of the Tunnel
  • Also schematic Circuit Diagrams of the Drainage System for Temporary works, including Pump Stations
  • Which included Drg
  • For Brackets and Pipework, which were manufactured to allow the Pipework to run from Running Tunnels to the Service Tunnel, and rolled round the Tunnel wall and flow in and out of the many pump Stations?

Revit MEP Technician

WSP Basingstoke
05.2003 - 09.2015
  • Project BHR Hospital various buildings modifications to all MEP services in 3D using 2014 Revit MEP

3D MEP Building Services Design Coordinator

Waterman Grpoup
London
04.2014 - 03.2015
  • Angle Court 26 Floors
  • Design drawings and models in Fabrication CAD (CADDuct) One Bedford Avenue 7 floors of office space Cat A Fit-out in, Project apartment block St Edmunds Terrace- Re co-ordinate all MEP Service in basement B1 using Revit 2014.

BIM Manager/Coordinator

FHPP Ltd
London
11.2013 - 04.2014
  • Project apartment block St Edmunds Terrace- Re co-ordinate all MEP Service in basement B1 using Revit 2014. The coordination of all building services including the production of single services instalation drawings

CAD Technician

Kier Construction
Basingstoke
10.2013 - 11.2013
  • Projects London Fire Brigade Station
  • Responsibility to co-ordinate all MEP services, using Revit MEP
  • Including the production of 2D Drawings
  • This had to be done to Kiers own BIM standards.

Revit/CAD BIM Manager

MJLonsdale
London
05.2013 - 11.2013
  • Project is the refurbishment of the New Bodleian Library in Oxford
  • This job is being drawn in Revit and I am responsible for the full M&E co-ordination & production of Drawings.

Senior Revit Cordinator

Norstead
05.2013 - 10.2013
  • Project is the Lister Hospital Ward Block
  • This job is being drawn in Revit and I am responsible for the full M&E co-ordination & production of Drawings
  • Also I am employed to oversee the Revit for the company as it is their first venture into 3D and Revit.

Lead 3D CAD Coordinator

EMCOR
06.2010 - 10.2013
  • AWE- working on a variety of projects using both AutoCAD MEP & CAD Duct)
  • This is being used for all Mechanical, Electrical & Public Health Services.- There is a Underground trench- With an M&E Services Module with a Unistrut Steelwork Frame –built off site delivered and installed for ease of build, reduced time, reduced Main corridor, again an M&E Module, for the same reason as the trench, There is also a M&E Building- With all pumps and associated pipework & containment are skid mounted, the LTHW pipework around the boilers is in a steelwork frame delivered to site
  • There is another Building – Again the same idea is in this building was that all the M&E services are floor mounted modules containing all the M&E Services
  • From these modules the Services the branch off of the primary runs then set up through structural openings into the rooms

Lead 3D CAD Coordinator Supervisor

Milltechnology Ltd
London
08.2007 - 05.2010
  • Project ONC fit-out, full M&E Co-ordination of all service within the ceiling void this was started in Delhi but was brought back to the UK to be finished
  • It was drawn in a combination of CADDuct for the Ductwork & Public Health pipework & Revit for the mechanical, sprinkler pipework, electrical containment and small power & lighting.
  • Project St
  • Bart’s Hospital (phase 2) full M&E Co-ordination including medical gases for Skanska this phase was to be drawn in India
  • Therefore I was in Delhi supervising the setting up of the project in India
  • I had to do an introduction to the project review of existing way we work in the UK the type of services we were expecting them to draw and the then on to the way we produce the drawings including the level of information we expect on the drawings
  • Including the review of all staff assigned to the project, liaising with their project manager
  • Then overseeing the production of the 3D models & drawing sheets
  • This project was being drawn, using Autodesk Revit 3D software
  • Revit training: - using the training manuals that Milltech have I sat down and underwent basic Revit training
  • From that I moved onto producing builderswork openings for the MEP services in the basement areas of ONC using Revit
  • Before I moved on to St Bart’s

3D REVIT\CAD Coordinator/Designer

Miltechnology
London
01.2007 - 05.2010
  • Project sapphire, client CHt & Thales (MOD contractor) this project was for the new manufacturing centre for flight simulators
  • We working with WSP and producing Installation drawing from concept designs & basic schematic’s my role was the Multi service modules I designed the steelwork and multi services models all the primary corridors and then went on to do the manufacturing drawings for the external plant room i.e
  • LTHW Boileroom, CHW Plantroom, Chiller Compound and connecting pipework
  • Between these areas and the main building.

CAD Manager

The MG Partnership
01.2006 - 01.2007
  • In charge of Drawing production on all projects, 2D & 3D, review of work carried out by the staff, instigation of new procedures
  • Review of current work requirements, the recruitment of new personnel as a when required
  • Out sourcing of drawing work during peak periods, production review meetings with directors and planner
  • Review and amendments to all office procedures
  • Including drawing work and issuing projects client to tender & contract.

3D Building Services CAD Manager

Axima
London
05.2005 - 08.2006
  • Responsible for drawing production of the Waterfront project for the regeneration of the O2 arena (Dome)
  • These were multi service drawings for all trade contractors
  • This included drawing production schedule, organisation of RFI's, drop line weekly reports on drawing production, weekly coordination meeting with consultants, & client
  • Also checking drawings, prior to issuing onto BIW, for approval.

CAD Engineer/Coordinator

Axima
08.2005 - 05.2006
  • Producing 3D Co-ordinated drawings using CADDuct, also producing Pre- fabricated manufacture drawings of the core solution pipework from the 3D model of M&E building services
  • For Allen & Overy’s new offices, at Bishops Square London.

3D Building Services CAD Engineer/Coordinator

Amec
London
06.2004 - 08.2005
  • Producing 3D drawings of M&E services within the service corridors for Heathrow T5a main Building
  • Then moved to the Energy Centre, on production of 3D pipework arrangements
  • Of the LTHW, CHW & Condenser Water Services for the plant areas
  • Including the production of steelwork, for the pipe supports
  • Also prefab details, for installation purpose
  • Using CADDuct and AutoCAD ADT3.3 &, , for the production drawings of the prefab/Install pipework.

3D Building Services CAD Coordinator

Crown House Engineering
London
11.2003 - 06.2004
  • Electrical & Public Health detailed production drawings for the Pier & Plantrooms, VCC also other areas
  • For the T3 Pier 5 project at Heathrow Airport.

CAD Engineer/Coordinator

Crown House Engineering
03.1999 - 06.2004
  • Production of Mechanical, Electrical & Public Health detailed production drawings for the Pier & Plantrooms, VCC also other areas. For the T3 Pier 5 project at Heathrow Airport

CAD Engineer/Coordinator

Crown House Engineering (CHE)
London
06.2002 - 11.2003
  • Production of pier products detailed designs, for the BAA at Gatwick & London Airports
  • This included the production of the concept design drawings with WSP and then the Coordination Mechanical & Electrical in 2D & 3D
  • With production drawing for Manufacture & Installation, on the Pier 2 & 3 Segregation Project at Gatwick using CAD Duct 3D package

CAD Manager

Crown House Engineering (CHE)
London
01.2000 - 06.2002
  • Responsible for all Detailed Design of Mechanical & Public health pipe work on Forty-Four floors
  • This included the staffing requirements of all CAD personnel
  • The allocation of all work loading, of staff
  • Production of Drawing schedules, for approval/signing off of Co-coordinated services drawings
  • Attending weekly design review meetings, and co-ordination meetings with other trades, consultants & client
  • The production of drawings if and when time allows, etc., etc.

Project Lead M&E CAD Coordinator

Crown House Engineering (CHE)
London
02.1999 - 01.2000
  • Responsible for Coordinating & Producing Coordination Drawings for the new offices at 25 Cannon Street, this also involves attending meetings liaisons with Main Contractor, Building Service Consultants, Architect, Client and various sub-contractors


3D Ductwork Detail Draughtsman

Hotchkiss Ductwork Ltd
Eastbourne
06.1998 - 02.1999
  • Producing Coordination Drawings of Apartment Layouts. Fan & Plantrooms and Car park Extract Systems, for the Canary Riverside Project.

E CAD Coordination Draughtsman

FHP Building Services Consultants Ltd
London
04.1998 - 06.1998
  • Producing Initial Design Drawings as well as Coordination drawings of Plantrooms and Risers
  • Project Riverbank House

CAD Draughtsman

Biwater International Ltd
Dorking
02.1998 - 04.1998
  • Water treatment plant, for Kuala Lumpur
  • Civil outline Details, Pipework Details-including isometric and 2 D drawings and General Arrangement Drawings.

CAD Co-ordination Draughtsman

MJN Ltd
London
11.1997 - 02.1998
  • M, E & PH) on the Royal Albert Hall
  • Initial Design Drawings to confirm feasibility of Consultants Design can work
  • Also Detailed Design of Drainage pipework, Plantrooms Ductwork, Piecework & Electrical Trunking & Services work to start in the New Year.

CAD Co-ordination Draughtsman

Southern Water Technology
01.1997 - 06.1997
  • M & E) working on various Projects such as Broadstairs Margate UWWTD Enhancement schemes. Morestead UWWTD Sludge Pumping Station

Co-ordination Draughtsman

Haden Young
Maidstone
02.1997 - 05.1997
  • On Mechanical Drainage & Pipework for the New Brighton Shopping Centre

CAD Co-ordination Design Draughtsman

Balfour Maunsell Duration
01.1997 - 03.1997
  • M & E) on the new Water Treatment plant at Shalford for Thames Water
  • To produce Design Drawings for Sub-contractors to install to
  • This Included P & I Diagrams P&D Diagrams and General Arrangement Assembly’s and full detailed Design Drawings showing pipe fittings, valves, pumps etc
  • Using Stancad and G.F
  • Fittings

CAD Manager/Administrator

Rust Consulting ltd, Rust Kennedy & Donkin
1 1 - 01.1997
  • Projects worked on Surrey University & Sussex University Library’s Extension
  • But the main Project was to Co-ordinate the Drawing work, for the nine Underground Stations that were being designed for Bangkok’s south side of the city
  • This included the pricing of the Drawing work, which was sent out to a Contract Drawing Office
  • Also the Control of the Drawing Register in this country and the Progress sheets keeping track of their Status
  • Transmittal of Drawings etc
  • To the client via the Internet.

Draughtsman

ERG, Air Pollution Control/Lancy Water Engineering
1 1 - 01.1997
  • To produce Drawings of the following: -Pipework Schematics, P&ID Diagrams, Tank Details, Support Frames, Pipework and Ductwork Supports, Civil works Cable Diagrams on AutoCAD LT
  • AutoCAD R12
  • Description of work: Water Treatment Plants for Chemical plants: Shin-ezu in Scotland
  • Southern Water Services, Pesticide & lead removal schemes
  • Air Pollution Control plants for Chemical plants: ICI Runcorn, Optical Fibers Deeside.

Ventilation CAD Detail Draughtsman

Hotchkiss Ductwork Ltd
Eastbourne
06.1993 - 12.1993
  • AutoCAD R12
  • Project: Glaxo
  • Stevenage
  • Banque Indosuez
  • 122 Leadenhall Street
  • Description of Work: Ductwork Detailing Layouts, & Issuing for Manufacture/Installation

MECHANICAL/ELECTRO, CAD Operator/Draughtsman

Silvertech
12.1993 - 08.1993
  • Fire Detection/Control Panels for Atomic Energy Authority Description of work: Electrical Wiring Diagrams & Logic Diagrams.

Designer/Engineer

S.B.F.I Newhaven
Newhaven
04.1992 - 05.1992
  • Dealer Desks, Special Banking Furniture & Control Room Consoles for the Police & Air traffic Control
  • Cad System: Radraft by Radan using Unix on Sun Sparc Stations
  • Description of work: To Produce Design Detail Drawings for approval, manufacture & Assembly in Timber, Metals & Plastics
  • Issuing project for manufacture, including progress sheets & cutting lists for each part so it can be followed through Manufacture to Test fit and Assembly
  • With the final product being signed off approved.

CAD Operator/Draughtsman

Sir Frederick Snow & Partners
London
11.1991 - 03.1992
  • AutoCAD R11
  • Project: Saudi Arabian Teaching Hospital
  • Description of work: Architectural Drgs
  • Including Partitions, Ceilings, Lighting, Floors and Builderswork etc

Project Manager, Engineer & Draughtsman. Cad

J Gardner & Co Ltd, Swallow Hotel
London
05.1991 - 11.1991
  • Revit Modelling and coordination of the Electrical & Fire Detection\Alarm conduit including pull boxes and support locations, including clash resolutions of some existing clashes
  • Including the addition of metadata., Concerto & AutoCAD 12
  • Project: Ciba Geigy, Pfizer’s, Mutual & St George’s House, Broadgate Ph14 Level 1-4, , Appold St
  • Lehman Brothers
  • 30-7-90 to 10-3-91 & 5-6-91 to 1-11-91 & 23-5-92 to 8-6-93 Description of work: Design Detail Drgs
  • Manufacture of all Ductwork, Electro-mechanical, electrical, control Wiring, Pipework and Sprinkler systems in the ceiling void
  • Complete with scheduling of equipment procurement and coordination works
  • Also involving various Project and Sub-contractor meetings enabling an overall Planned Program of works to be scheduled
  • This also incurred the responsibility for all site erection, installation and safety works

Design Draughtsman

Transmanche-Link
Dover
03.1990 - 07.1990
  • Project: Underground Ventilation and Drainage Systems. Description of work: Design Detail and Manufacture of the suspended Booster Fans Platform for the Tunnels, used during Construction. This involved a complete Design including all Shear Force & Bending Moments Diagrams and Stress calculations. Also all details, assembly & Welded Frame Drgs. Source and procurement of materials including inspection prior to Installation/Assembly from the Crown of the Tunnel. Also schematic Circuit Diagrams of the Drainage System for Temporary works, including Pump Stations. Which included Drg. for Brackets and Pipework, which were manufactured to allow the Pipework to run from Running Tunnels to the Service Tunnel, and rolled round the Tunnel wall and flow in and out of the many pump Stations?

Design Draughtsman

GEA Spiro
1 1 - 03.1990
  • Projects: Transmitter Station Cooling Systems
  • (IBA, BBC & Overseas) Description of work: Design/Detail & Manufacture AHU’s, Ductwork, Welded Frames, Panels & Associated equipment with the Supply & Extract of Air for the Ventilation Systems.

Design Draughtsman

Computing Devices Co. Ltd
Hastings
09.1987 - 10.1989
  • Projects: Missile Test Equipment
  • (MTS) Real Time Reconnaissance System (CDIRRS)
  • Forward Looking Infrared Camera (FLIR)
  • Ground Cockpit Trainer (GCT)
  • System: AutoCAD R8 to 10
  • Description of work: Drawings & Diagrams for Manufacture Assembly and Test: Process Control, Interconnection Wiring, Wiring Lists, Details, and Electrical & Mechanical Assemblies & Parts Lists
  • Materials used on these Projects ranged from Metal, Softwood & Hardwood to Glass Reinforced Plastic (GRP)
  • The Equipment was housed in Special Cast Housings, & 19inch Racks the GCT was designed with quick release fasteners for ease of transportation

Draughtsman

Countryman Power & Plant Ltd
10.1987 - 12.1987
  • Generators and Mobile Welders
  • Description of work: Detail and Assembly Drawings for Manufacturing of: Welding/Fabrication/Panels/Tanks/Frames Drawings including pipework.

Draughtsman

Roband Electronic Ltd
01.1987 - 11.1987
  • Power Supplies
  • Description of work: To produce Manufacturing Drawings of: Electrical & ELECTRO-Mechanical Details & Assemblies including Printed Circuit Boards for Manufacture.

Design Draughtsman

Singer Link Miles. Ltd
Lancing
05.1986 - 07.1986
  • Flight, Tank & Sub Simulators, Description of work: Detailed Manufacturing Drawings, Sheet Metalwork, Machined Blocks, Wiring List, Wiring Diagrams, Structured Frames, Assemblies, Items Lists, Welded Frames.

Design Draughtsman

MEL (Philips Military Division)
Crawley
05.1984 - 05.1985
  • Description of work: Detailed Manufacturing Drawings, Sheet Metalwork, Machined Blocks, Wiring List, Wiring Diagrams, Structured Frames, Assemblies, Items Lists, Welded Frames
  • 4-6-84 to 6-5-85 & 6-10-86 to 27-2-87
  • Description of work: To produce Detailed Manufacturing Drawings and Assemblies of the following equipment: Special Substrates (Printed Circuit Board’s with very small diodes, resistors etc surface mounted) Machined Blocks for mounting these PCB’s castings for gearbox and associated gears
  • The Radar Dish complete with the IFF System attached.

Draughtsman

Yoxal
Redhill
05.1984 - 06.1984
  • Detailed Assembly and Installation Drawings of Racking Systems for Instruments
  • For the oil & gas industry

Design Draughtsman

Invertron Simulated Systems
Burgess Hill
03.1982 - 03.1984
  • Projects: Classroom Trainers for Artillery Observers & Gunners
  • Description of work: To Produce Detailed Manufacturing Drawings and Assemblies of: Desks/Consoles, Space Frames, PCB’s, Mirror Boxes, Power Supplies, And Welded Frames etc

D.O. Manager/Design Draughtsman

Eberline Instrument Co. Ltd
Crawley
02.1981 - 01.1982
  • Projects: Radiation Measuring Instruments & Detectors
  • Description of work: To produce detailed Manufacturing Drawings & Assemblies of: 19” Frames/Cabinets, Hand Operated Detectors/Measuring Devices, Hand Portable Detectors and Bench Mounted Detectors etc
  • The Drawings were Sheet Metalwork, Machined Blocks, and Welding Frames etc
  • I also produced the Drawing Office specification and gained Ministry approval of the as there was no Drawing Office when I joined the Company.

Design Draughtsman

Neumo-AliteLtd.Newhaven
08.1979 - 04.1980
  • Project: Filling Equipment
  • Description of work: To Produce Detailed Manufactured Drawings & Assemblies of: Semi-Automatic Automatic & Manual Filling Machines food the Food, Pharmaceutical and paint Industry
  • This required Welded Frames, Sheet metalwork, Tanks, Machined Blocks & Pneumatic Diagrams.

Layout Draughtsman

Upjohn Pharmaceuticals
Crawley
09.1979 - 10.1979
  • Work: Plant Layout and Flow Diagrams of all Production Machines including services: Water, Single Phase & Three Phase Electric’s, Gas and Compressed Air within the Manufacturing Facility of the plant.

Draughtsman

Greenwood Airvac
Rustington
08.1979 - 09.1979
  • Of work: To produce detailed Manufacturing Drawings of Louvered panels
  • For Various Buildings working from Architects Drgs., Food Industry M/C’s, Description of work: Pre Production Design Drawings for a Skinless Sausage Machine, also including Plant Layout.

Design Draughtsman

Wade blowers & Superchargers
Brighton
06.1977 - 08.1979
  • Description of work: To Produce, of Blowers and Blowing Systems
  • This included the following Drawings Fabrication, Frames, Casting, Machined Blocks, Gears, and Drive Couplings etc

Tr. Design Draughtsman

Clifford Edwards Ltd
Hove
02.1975 - 05.1977
  • High Pressure Filtration Systems: Description of work: To produce the following detailed Manufacturing Drawings
  • Welded Frames, Machined Blocks/Shafts, Electrical, Tanks, Hydraulic and Pipework.

Education

Certificate Course -

Chartered Institute of Buildings
Croydon
05-1990

Legislation/Site Operations & Organization -

Institute of Construction Management
Croydon
05-1990

City & Guilds Full Tech. Certificate Phase 1,2&3 Including Full Technical Certificate - Mechanical Engineering

City & Guilds
Worthing Technical College
08-1978

Skills

  • Project planning
  • Documentation control
  • Contract administration
  • Parametric design
  • Navisworks proficiency
  • Energy analysis
  • AutoCAD
  • BIM execution plan
  • Revit expertise
  • MEP coordination
  • Clash detection
  • BIM management
  • Site supervision
  • Model coordination
  • Design collaboration
  • Value engineering
  • Construction documentation

Construction Industry Positions

  • Exyte, 06/2024 - 12/2024, Revit Modelling and coordination of the Electrical & Fire Detection/Alarm conduit
  • Keysource, 05/2023 - 05/2024, BIM Coordinator Stage 5 Design, Project Refurbishment of a Data Centre in Brussels
  • Skanska SRW Engineering Services, 02/2022 - 06/2024, BIM Coordinator Stage 5 Design, Project Data Centre in Slough
  • E Poppleton & Son’s Ltd, 11/2021 - 01/2022, Ventilation Contractor – position Ductwork Detailer Project Astra Zeneca
  • RoyalHaskoningDHV, 06/2021 - 10/2021, Revit Coordinator for Project LHR11
  • WBS Group Ltd, 03/2020 - 05/2021, Senior BIM Manager/Coordinator for Project Data Centre Paris
  • N G Baily’s, 01/2019 - 03/2020, Senior Revit Coordinator for New Stadium for Brentford FC
  • PhoenixME, 10/2018 - 12/2018, Senior Revit Coordinator for Battersea Power Station redevelopment Phase3A
  • Imtech, 01/2018 - 09/2018, BIM Manager for 53 Storey Apartment Complex called The Madison
  • ESG Plc, 02/2017 - 01/2018, MEP BIM Manager/Coordinator for Project 145 City Road
  • NG Bailey’s, 02/2016 - 03/2017, MEP Coordinator for Schools Design & Build
  • Grontmij Building Services Consultants Ltd (SWECO), 09/2015 - 02/2016, 3D Revit MEP Coordinator specialising in Public Health Drainage systems
  • WSP Basingstoke, 03/2015 - 09/2015, Revit MEP Technician for BHR Hospital
  • WATERMAN GROUP, 04/2014 - 03/2015, 3D CAD Technician for project Angle Court
  • FHPP Ltd, 11/2013 - 04/2014, BIM Manager/Coordinator for apartment block St Edmunds Terrace
  • Kier Construction, 10/2013 - 11/2013, CAD Technician for London Fire Brigade Station
  • Norstead, 08/2013 - 10/2013, Senior Revit Coordinator for Lister Hospital Ward Block
  • MJLonsdale, 02/2013 - 08/2013, Revit/CAD Manager for refurbishment of the New Bodleian Library in Oxford
  • EMCOR, 06/2010 - 02/2013, Lead 3D Cad Coordinator for various projects
  • Milltechnology Ltd, 01/2007 - 05/2010, Lead 3D Cad Coordinator supervisor for ONC fit-out
  • The MG Partnership, 09/2006 - 01/2007, CAD Manager
  • Axima, 05/2006 - 08/2006, CAD Manager for Waterfront project
  • Axima, 08/2005 - 05/2006, CAD Engineer/Coordinator for Allen & Overy’s new offices
  • Amec, 06/2004 - 08/2005, CAD Engineer/Coordinator for Heathrow T5a main Building
  • Crown House Engineering, 02/1999 - 06/2004, CAD Engineer/Coordinator for T3 Pier 5 project at Heathrow Airport
  • Hotchkiss Ductwork Ltd, 06/1998 - 02/1999, M&E CAD Coordination & Ductwork Draughtsman
  • FHP Building Services Consultants Ltd, 04/1998 - 06/1998, M&E CAD Coordination Draughtsman for Riverbank House London
  • Biwater International Ltd, 02/1998 - 04/1998, CAD Draughtsman for water treatment plant in Kuala Lumpur
  • MJN Ltd, 11/1997 - 02/1998, CAD Co-ordination Draughtsman on the Royal Albert Hall
  • Balfour Maunsell, 08/1997 - 11/1997, CAD Co-ordination Design Draughtsman for new Water Treatment plant
  • Southern Water Technology, 06/1997 - 08/1997, CAD Co-ordination Draughtsman
  • Haden Young - Maidstone, 04/1997 - 06/1997, Co-ordination Draughtsman
  • Rust Consulting ltd, 01/1997 - 04/1997, CAD Manager/Administrator
  • ERG (Air Pollution Control/Lancy Water Engineering), 03/1994 - 01/1997, Contract Draughtsman
  • Hotchkiss Ductwork Ltd, 06/1993 - 07/1993, CAD Operator/Draughtsman
  • J Gardner & Co Ltd, 07/1990 - 06/1993, Project Manager, Engineer & Draughtsman
  • Sir Frederick Snow & Partners, 11/1991 - 03/1992, CAD Operator/Draughtsman
  • Transmanche-Link (TML), 03/1990 - 06/1991, Design Draughtsman
  • GEA Spiro-Gills, 10/1989 - 03/1990, Design Draughtsman
  • Greenwood Airvac, 06/1986, Draughtsman
  • Upjohn Pharmaceuticals, 06/1986, Layout Draughtsman

Personal Information

  • Date of Birth: 06/25/57
  • Nationality: British
  • Marital Status: Married with 1 child

Computer Programmes Used

  • Microsoft Excel
  • Microsoft Word
  • Various Document Management Systems such as BIW, Conject, Asite, 4projects, Meridian, Hummingbird
  • 3D Software used BSLink, AutoCad, FabCad (CADDuct), AutoCAD MEP, & Revit MEP various releases
  • Naviswork Manage & Simulate, 2021

Cad Systems Used

  • AutoCAD, & AutoDesk MEP
  • Autodesk Revit MEP 2023
  • Concerto by ESC - Running on Dos Based PC’s (IBM & AutoCAD Compatible)
  • Radraft by Radan - Running on Sun Sparc stations using Unix Computers

Timeline

BIM Coordinator

Keysource Ltd
05.2023 - 05.2024

MEP 3 CAD Coordinator

St Bart’s Hospital
05.2023 - 05.2024

BIM Coordinator\BIM Manager

Skanska
02.2022 - 06.2024

Ventilation Contractor

E Poppleton & Son’s Ltd
11.2021 - 01.2022

MEP Revit Coordinator

RoyalHaskoningDHV
06.2021 - 10.2021

Senior BIM Manager/Coordinator

WBS Group Ltd
03.2020 - 05.2021

Senior Revit Coordinator

N G Baily
01.2019 - 03.2020

Senior Revit Coordinator

PhoenixME
10.2018 - 12.2018

BIM Manager

Imtech
01.2018 - 09.2018

MEP BIM Manager/Coordinator

ESG Plc
02.2017 - 01.2018

MEP Coordinator

NG Bailey
02.2016 - 03.2017

3D Revit MEP Design Co-ordinator

Grontmij Building Services consultants Ltd (SWECO)
09.2015 - 02.2016

3D MEP Building Services Design Coordinator

Waterman Grpoup
04.2014 - 03.2015

BIM Manager/Coordinator

FHPP Ltd
11.2013 - 04.2014

CAD Technician

Kier Construction
10.2013 - 11.2013

Revit/CAD BIM Manager

MJLonsdale
05.2013 - 11.2013

Senior Revit Cordinator

Norstead
05.2013 - 10.2013

Lead 3D CAD Coordinator

EMCOR
06.2010 - 10.2013

Lead 3D CAD Coordinator Supervisor

Milltechnology Ltd
08.2007 - 05.2010

3D REVIT\CAD Coordinator/Designer

Miltechnology
01.2007 - 05.2010

CAD Manager

The MG Partnership
01.2006 - 01.2007

CAD Engineer/Coordinator

Axima
08.2005 - 05.2006

3D Building Services CAD Manager

Axima
05.2005 - 08.2006

3D Building Services CAD Engineer/Coordinator

Amec
06.2004 - 08.2005

3D Building Services CAD Coordinator

Crown House Engineering
11.2003 - 06.2004

Revit MEP Technician

WSP Basingstoke
05.2003 - 09.2015

CAD Engineer/Coordinator

Crown House Engineering (CHE)
06.2002 - 11.2003

CAD Manager

Crown House Engineering (CHE)
01.2000 - 06.2002

CAD Engineer/Coordinator

Crown House Engineering
03.1999 - 06.2004

Project Lead M&E CAD Coordinator

Crown House Engineering (CHE)
02.1999 - 01.2000

3D Ductwork Detail Draughtsman

Hotchkiss Ductwork Ltd
06.1998 - 02.1999

E CAD Coordination Draughtsman

FHP Building Services Consultants Ltd
04.1998 - 06.1998

CAD Draughtsman

Biwater International Ltd
02.1998 - 04.1998

CAD Co-ordination Draughtsman

MJN Ltd
11.1997 - 02.1998

Co-ordination Draughtsman

Haden Young
02.1997 - 05.1997

CAD Co-ordination Draughtsman

Southern Water Technology
01.1997 - 06.1997

CAD Co-ordination Design Draughtsman

Balfour Maunsell Duration
01.1997 - 03.1997

MECHANICAL/ELECTRO, CAD Operator/Draughtsman

Silvertech
12.1993 - 08.1993

Ventilation CAD Detail Draughtsman

Hotchkiss Ductwork Ltd
06.1993 - 12.1993

Designer/Engineer

S.B.F.I Newhaven
04.1992 - 05.1992

CAD Operator/Draughtsman

Sir Frederick Snow & Partners
11.1991 - 03.1992

Project Manager, Engineer & Draughtsman. Cad

J Gardner & Co Ltd, Swallow Hotel
05.1991 - 11.1991

Design Draughtsman

Transmanche-Link
03.1990 - 07.1990

Draughtsman

Countryman Power & Plant Ltd
10.1987 - 12.1987

Design Draughtsman

Computing Devices Co. Ltd
09.1987 - 10.1989

Draughtsman

Roband Electronic Ltd
01.1987 - 11.1987

Design Draughtsman

Singer Link Miles. Ltd
05.1986 - 07.1986

Design Draughtsman

Philips Research Laborites
01.1985 - 03.2016

Design Draughtsman

MEL (Philips Military Division)
05.1984 - 05.1985

Draughtsman

Yoxal
05.1984 - 06.1984

Design Draughtsman

Invertron Simulated Systems
03.1982 - 03.1984

D.O. Manager/Design Draughtsman

Eberline Instrument Co. Ltd
02.1981 - 01.1982

Layout Draughtsman

Upjohn Pharmaceuticals
09.1979 - 10.1979

Design Draughtsman

Neumo-AliteLtd.Newhaven
08.1979 - 04.1980

Draughtsman

Greenwood Airvac
08.1979 - 09.1979

Design Draughtsman

Wade blowers & Superchargers
06.1977 - 08.1979

Tr. Design Draughtsman

Clifford Edwards Ltd
02.1975 - 05.1977

CAD Manager/Administrator

Rust Consulting ltd, Rust Kennedy & Donkin
1 1 - 01.1997

Draughtsman

ERG, Air Pollution Control/Lancy Water Engineering
1 1 - 01.1997

Design Draughtsman

GEA Spiro
1 1 - 03.1990

Certificate Course -

Chartered Institute of Buildings

Legislation/Site Operations & Organization -

Institute of Construction Management

City & Guilds Full Tech. Certificate Phase 1,2&3 Including Full Technical Certificate - Mechanical Engineering

City & Guilds
Jonathan Strauss