Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Languages
Timeline
Hi, I’m

Flor Turnil

Carrer De Sant Isidre 102

Summary

Practical and hands-on [Job Title] adept at successfully and effectively interacting with contractors across multiple construction sites. Excellent project management abilities demonstrated by career history of on-schedule and on-budget completed projects. Particular experience in [Type] projects.

Overview

23
years of professional experience
1
Certification

Work History

Griffith Foods

Engineering Manager
06.2019 - Current

Job overview

  • Evaluated project requirements to identify and mitigate risks.
  • Addressed design challenges and evaluated alternative design models to meet project requirements.
  • Coordinated engineering team for projects in commercial and industrial development.
  • Managed design and manufacturing teams to build proprietary process equipment within aggressive cost and time constraints.
  • Checked design compliance with product specifications and standards requirements.
  • Coordinated selection of manufacturing methods, fabrication and operation of product designs.

Coty

Senior Engineering Project Manager
06.2016 - 06.2019

Job overview

  • Kept projects on schedule and within budget while serving as project leader.
  • Developed and led multi-disciplinary team to redefine problems and reach solutions based on different perspectives.
  • Checked design compliance with product specifications and standards requirements.
  • Proposed design concepts, worked with customers to incorporate changes and oversaw design process.
  • Outlined work plans, determined resources, wrote timelines, and generated initial budgets as part of project scope determination.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.

Bacardí

Engineering Project Manager
11.2011 - 04.2016

Job overview

  • Kept projects on schedule and within budget while serving as project leader.
  • Developed and led multi-disciplinary team to redefine problems and reach solutions based on different perspectives.
  • Proposed design concepts, worked with customers to incorporate changes and oversaw design process.
  • Checked design compliance with product specifications and standards requirements.

Lewa Hispania

Head of Engineering
10.2010 - 10.2011

Job overview

  • Reviewed and approved product designs, verifying compatibility with project principles and goals.
  • Delegated work to teams of engineers and technicians, distributing responsibilities to maximize useful skills and avoid knowledge gaps.
  • Traveled to off-site locations to manage remote work and engineering projects, overseeing [Number] workers.
  • Produced executive summaries and informative metrics for progress reports and presentations for senior leadership.

Colgate-Palmolive

Project Manager
02.2008 - 03.2010

Job overview

  • Planned, designed, and scheduled phases for large projects.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Colgate-Palmolivve

Packaging Project Engineer
04.2006 - 02.2008

Job overview

  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Identified technical risks within managed projects.

Colgate-Palmolive

Process Control Engineer
02.2004 - 03.2006

Job overview

  • Provided technical assistance to production team when issues arose.
  • Reviewed processes, identifying areas requiring improvement.
  • Conducted root cause analysis to identify, prioritize and eliminate process losses.
  • Participated in project reviews to enable ongoing status tracking and reporting.

Colgate-Palmolive

Productivity Engineer
11.2002 - 01.2004

Job overview

  • Performed preventative maintenance to keep tools and equipment functional.
  • Prepared action plans for problematic processes and assets.
  • Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.

Colgate-Palmolive

Manufacturing Trainee
01.2002 - 10.2002

Job overview

  • Maintained organized work area by cleaning and removing hazards.
  • Made sure that products were produced on time and are of good quality.
  • Met production targets and tight deadlines by collaborating closely with team members.
  • Organized and prepared workstations and materials needed for operations to maximize productivity.

Bayer

Manufacturing Trainee
01.2001 - 12.2001

Job overview

  • Maintained organized work area by cleaning and removing hazards.
  • Made sure that products were produced on time and are of good quality.
  • Met production targets and tight deadlines by collaborating closely with team members.
  • Organized and prepared workstations and materials needed for operations to maximize productivity.

Education

Oxford Women´s Leadership Development Programme
Oxford

No Degree from Organizational Leadership
2022

University Overview

Manufacturing Facilities Management
Universidad Politécnica De Cataluña

Post Graduate
2015

University Overview

Project Management (MPM)
Universidad De La Salle

Master of Science from Project Management
2009

University Overview

Master in Business Administration
Universidad De Valparaiso De Chille

MBA from Business Administration And Management
2008

University Overview

Investments Project Evaluation
Aden Business School

Post Graduate
2007

University Overview

Skills

  • Cost Management
  • Qlik Tech QlikView
  • Atlassian JIRA
  • Microsoft Project
  • Microsoft Excel
  • Decision-Making Skill
  • Manage Budgets
  • Equipment Knowledge
  • Mentoring

Accomplishments

Accomplishments
  • Eliminated [Type of waste], saving company $[Number] per year.
  • Directed [Name] project with $[Amount] budget.
  • Developed [New process or procedure] resulting in [Improvement].
  • Brought about [Result] through [Action].
  • Transformed [Area] through [Change].
  • Eliminated [Type of waste], saving company $[Amount] per year.
  • Earned "[Award Name]" Award for [Reason].
  • Increased business efficiency by implementing [Specific change].
  • Collaborated with team of [Number] in the development of [Project name].

Certification

  • [Area of certification], [Company Name] - [Timeframe]

Languages

Spanish
Bilingual or Proficient (C2)
English
Advanced (C1)
German
Elementary (A2)

Timeline

Engineering Manager
Griffith Foods
06.2019 - Current
Senior Engineering Project Manager
Coty
06.2016 - 06.2019
Engineering Project Manager
Bacardí
11.2011 - 04.2016
Head of Engineering
Lewa Hispania
10.2010 - 10.2011
Project Manager
Colgate-Palmolive
02.2008 - 03.2010
Packaging Project Engineer
Colgate-Palmolivve
04.2006 - 02.2008
Process Control Engineer
Colgate-Palmolive
02.2004 - 03.2006
Productivity Engineer
Colgate-Palmolive
11.2002 - 01.2004
Manufacturing Trainee
Colgate-Palmolive
01.2002 - 10.2002
Manufacturing Trainee
Bayer
01.2001 - 12.2001
Oxford Women´s Leadership Development Programme
No Degree from Organizational Leadership
Manufacturing Facilities Management
Post Graduate
Project Management (MPM)
Master of Science from Project Management
Master in Business Administration
MBA from Business Administration And Management
Investments Project Evaluation
Post Graduate
Flor Turnil