Summary
Overview
Work History
Education
Skills
Websites
Certification
Languages
Timeline
Generic
Carlos Manuel De la cabada Hernandez

Carlos Manuel De la cabada Hernandez

Malaga

Summary

I'm effective and competent engineer technician with experience in oil and gas exploration, Hydraulics, Marine engineering, Subsea equipment, pipe laying, rig Decommissioning and oil production refining and transportation. Qualified rescue emergency team full GWO and lifting operation LOLER Opito. Adapting very well in various work conditions, Excellent mechanical imagination and highly developed skills. Main features include responsible approach to tasks, strong motivation very good time organization and the ability to work under pressure. IWIND GWO Number D8789505 OPITO Vantage Number 1523914 Highly organized and self-motivated, work well individually and in groups. Proficient with computer literate such as Microsoft word, Microsoft, Excel, Power point and Internet, Programs Scada, Fluid Sim and Simatic 7 siemens PLC TIA portal. AutoCAD Solid work. Able to working independently and under pressure Ability to working, shifts Responsible for other duties as assigned. I've got really people skills, hard worker, love people, I'm a fast learner and I pick up pretty fast.

Experienced with technical troubleshooting, equipment maintenance, and system optimization. Utilizes analytical skills to diagnose issues and implement effective solutions. Track record of ensuring operational efficiency and minimizing downtime through proactive maintenance.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Senior Lay Technician

SUBSEA7
03.2025 - 08.2025

J lay systems on board the vessel seven Borealis

commissioning Replacement pipe work HYD , cylinder, pins, bearing accumulator ,in Angola inspection Draw works, traction winch, A&R Sheaves, Pipe roller guide, Upper and lower line up tool, replace all cylinders and accumulator traveling clamp block, check sensor and logic positioned ,length, inspection and replace the accumulator and cylinder clamp gripper pipe erector, PES winch .HPU testing leak and pressure test all systems, Prepare stinger and roller supports. replace stinger lifting cylinder paired HVAC Main Crane huisman 2400Nitrogentrogen leaking test found the leaking on the condenser part out side control cabin did brazing on pipe cooper repaired, leaking test a Vacuum systems operations after that fill up 6 k gas R 407 , check and repaired Hvac Emerson control room J Lay systems Recovery of gas R 407 C nitrogen leaking test , brazing repaired vacuum systems, put it back gas on system R407C refilled 3 k more until 6k working fine check superheat , subcooling and saturation liquid line and vapor line ok.

Seven champion vessel in KSA project pipeline 42 coating cement o concrete inch shallow water Maintenance A&R winch check 100 ton, MTR scanners check the wires level winder function, Maintenance and E motor. maintenance 2 tensioners 100 ton each check accumulator the clamping cylinder open the crosstie and replaced pads with bolt caterpillar special size, tension the chain according procedure holmatro Adjustment calibrated. adjust the lower and upper tensioners. check and operations the wire stinger winch MTR scanner take back off a socked clean and NDT inspections take back on the socket. check the break positing engaged and disengaged.

installation slew planetary gear box starboard crane, replaced the break Building Hydraulic motor. building and repaired slew planetary gear box change bearing bevel and dowels assemble.

H.P:U repaid leaking pump hoses change return filter and cooling systems. check all pipeline system tv car , lco ,conveyor line up etc.

Improved customer satisfaction with efficient installation and maintenance of equipment. Contributed to team success by collaborating on projects, sharing expertise, and providing support when needed. Maximized productivity by maintaining a clean workspace free from clutter or potential hazards during daily operations. Cleaned around tracks and completed important repairs to achieve maintenance targets.

Mechanical Technician

CAPE Holland
02.2025 - 02.2025

Project Taiwan Shinfox VLT640

Assemble VLT 640 single from beginning installation suppressor, lock cylinder,check elastomers, Upend cylinder install and flushing , connected all houses LCL,UCI,LCU installed Upend fork, take back on reel and clamp systems sc 12 .installation eccentric gearbox, Prepare the park stand and pile guide to insert the VLT 640 SINGLE.

leaking pressure test and load test therefor all functions clamp gearbox and upend cylinder.

other installation was VLT320 single 4 clamp gearbox suppressor upend cylinder etc according all procedure testing pressure and leak testing HPU test with approved functions movement.

in operation offshore taiwan project .Resolved mechanical issues using both technical and manual skills. Assembled and disassembled equipment to perform repairs and maintenance.

Frequently diagnosed mechanical problems and determined how to correct issues. Maintained clean and organized work area to easily locate repairing tools and equipment.

Deck Engineer

Seaway 7
01.2025 - 01.2025

Vessel Alfa lift TP installation project north sea

Winter installation, repaired and maintenance sea fastening systems TP wind farm project on deck Alfa lift vessel, inspections and NDT clamps services skidding cylinder and clamp cylinder, PM HPU services check and change hydraulic oil filter, Pressure transmitter and temperature sensor, Hydraulic houses changed, check Pressure relief valve and directional valve. Pressure test and leaking test. Function test clamping TP all of them 6 systems on board Alfa lift.

Maintained a clean and orderly work environment, promoting a culture of professionalism among crew members.

Senior Equipment Technician

Boskalis
10.2024 - 12.2024

Vessel supply Boka Bear noise mitigation system Operation by Hydraulic winch deploy inner and outer ring, connection by compressor flushing, create bubble cutting to installation the monopole seabed wind farm revolution project. Recovery outer ring and inner ring. Maintenance Hydraulic system winch, engine Volvo D13 Diesel, Air compressor unit Offshore, change the filter oil fuel air separator, services receiver drain water change oil. Instalación the equipment connection the hoses 4 inch inlet and outlet.

  • Optimized equipment performance through diligent monitoring, data analysis, and effective communication with operators.
  • Streamlined workflow processes by introducing innovative solutions that reduced labor hours spent on redundant tasks.
  • Improved equipment uptime by proactively performing preventive maintenance and troubleshooting complex issues.
  • Troubleshot equipment failures and remedied problems to restore functionality.
  • Maintained documentation of equipment maintenance tasks, new installations, and repair procedures.
  • Repaired and replaced worn and damaged components.

Comissioning Equipment Engineer

IQIP, France Noimoutier
05.2024 - 09.2024
  • Vessel Innovation DEME France Project wind farm Noimoutier Installation equipment LARS Launch and recovery system. GT Guiding Tool (skidding)Power pack HPU Installation hoses in blue return line and drain line to the system check list leak test pressure test and function operational as well Vessel Orion DEME EEUU Norfolk Project wind farm coast Virginia Operation winch and the hydraulic impact hammer piling and maintenance of the equipment, winch 2 umbilical hydraulic hoses Pine and R-line, number S-200 and S-1.200, power pack P3300 air compressor and 4 Diesel engine Pantin D13-80 Hydraulic Axial piston variable double pump each. Max working pressure 350 bar 2liter return line, Recirculating pump clean oil filter, succition line, return filter and drain filter, also added cooling oil system with filter recirculating pump. Maintenance Hummer check the accumulator nitrogen side, check and replaced HIC covers brass upper and lower location, calibration. Inspección visual al chamber hammer and conexión up. Replaced yellow pad pile sleeve, Maintained comprehensive records of all service calls, repair actions, and component replacements performed throughout the life cycle of each piece of equipment under my purview.

Senior Equipment Technician

Boskalis
02.2024 - 03.2024
  • Vessel supply Boka Bear noise mitigation system Operation by Hydraulic winch deploy inner and outer ring, connection by compressor flushing, create bubble cutting to installation the monopole seabed wind farm revolution project. Recovery outer ring and inner ring. Maintenance Hydraulic system winch, engine Volvo D13 Diesel, Air compressor unit Offshore, change the filter oil fuel air separator, services receiver drain water change oil. installation the equipment connection the hoses 4 inch inlet and outlet. Assisted in establishing preventative maintenance programs to minimize unexpected breakdowns and extend equipment life span.

Subsea Equipment Engineer

BOSKALIS
02.2023 - 10.2023
  • Installation the jacket to field wind farm WTG on Taiwan, prepare maintenance and testing functionality the subsea equipment's cleaning tool, winch umbilical and looking in hydraulic systems, HPU with engine, subsea equipment stopper cutting tool prepare maintenance and testing check hydraulic systems thruster slider cylinder open and close the arms looking pin, hydraulic motor winch connection gas and oxygen for cutting mixed gas, a adjust the proximity sensor solenoid valve compensator depth, accumulator lever ROV emergency systems umbilical torch regulator pression.

Service equipment Engineer offshore

Mcdermott, Mcdermott
09.2022 - 01.2023
  • Vessel pipeline laying J-LAY McDermott Amazon Installation and commissioning Automatic systems fire line conveyor J-lay to new Bor Porture Project Mauritania location pipeline gas LNG deep water 22 and VLS installation winch and hyd cylinder for clamp, Ramepact ILIUC, inspection Slider system JLT adjustment the shovers for hyd pin and chider cylinder sliding systems. Check functions of directional control valve, flow control valves, actuators, pumps pressure control valve, maintenance equipment HPUHydraulic pump unit alloy remove actuators, maintenance JLT Tower and Piston clamp and HOC Track Safety Clamp. Maintenance all hydraulic systems Automation Field joint coating systems assistance Team work PHJ, raptor MPP, FBE, saber Blasting, induction heating etc.

Deck Mechanic foreman

Seaway 7
03.2022 - 08.2022
  • Installation monopile HKZ, involved HKZ bubble vessel Noise Mitigation work, working with survey ROV assistance, deployment hoses liner and outers for bubble noise mitigation use winch verses Hydraulics 4 inch use the compressor Kaeser keep pression on seabed. recovery and deployment of the inner and outersleeves with the winch on board the vessel SEA GOLDCREST Vattenfall wind own progress.

Shift Leader Lay Deck Mechanic

The offshore partner
10.2020 - 11.2021
  • Akademic Cherskiy vessel pipeline 48 gas from Russia to Germany Gazprom project Anja north stream II gas project I've been working commissioning vessel for equipment pipeline 3 tensioners 250 tone SCS conveyor pipe elevator full special coating 48 to 450 HVO, winch A&R 250, bevel machine equipment winch ACE 60 tone Anchor hydraulics system cooling system with pneumatic systems clutches/ brake WPT Power transmission just used for payout target, crane TTS and Huisman main crane 1800 tone and stinger system Huisman equipment for north stream II Gazprom project.

Deck Mechanic Foreman

ALLSEAS
12.2014 - 07.2020
  • Allseas Marine Vessel pioneering spirit single lift installation and removal Construction and installations TLS topside & Assembly TLS 16 beam (top side lifting systems) on bow vessel, commissioning fine line and double joint, installation A &R (abandoned and recovery). Assembly TLS beam (topside lifting systems) on bow vessel, commissioning fine line and double joint, installation A &R (abandoned and recovery cable) 4 winch working in load 400 ton each one, tension set socket pulling cable A&R, put on there the thruster with 4 shackles WLL100 tones set 400 tones double 40 feet, maintenance tensioner hydraulic systems installation new 500 ton Huisman heave crane, with hoist drum crane, auxhoist hoist, mainblock, boom, hoist main, friction plate type belt brakes, adjustment the microclimits and sensor all brake arms on crane vessel at the hoist, installed chiller unit cooling system or driver from HVAC, lubrication systems, plc Scada and Simatic control. Allseas Marine vessel pioneering spirit single installation and removal First Project 2016 removal of the 13,500 tone West production unit platform Offshore Norway and then 2017 second project heavy lifting with single system and crane lift, 2400 tone Brent Delta field platform well record for offshore lifts, 2018 fully complete topside and single lifts installation to set down Equinor 22.000 ton Johan Sverdrup platform on jugaf Offshore Norway, finishing the project Turk Stream pipeline constructions 32 inch from Anapa Rusia to kyjoku Turquie 2 lines gas total length of pipe laid 180 km and 220 km depth Black sea, used 4 tensioners 500 ton each winch clamp capacity to Deepwater and now we are constructions new pipelines deep water from Rusia to Germany 48inch and project in bow heavy each approximately 27 ton joint the length of pipeline 2300km depth 2100 m Baltic sea NORD STREAM II.

Lay Mechanical tech offshore

Huisman crew Ltd
09.2014 - 11.2014
  • Hesmera Marine Vessel DSJV Aegir Pipe lay Singapore Sembawang Shipyard Maintenance The Heavy Lifts Crane Huisman 4000 ton JLT Huisman equipment check functions relief drive store, thensore check pads adjustment the setting squeezer cylinder, modified the main block Lower and repaired the crack inside the block, the bearing replacement sheaves block and seal, clean and alignment the shavs also using equipment hydraulic torque and tensioning, torque tightening, dismantling and removing. Replacing components, put on greases check the Guayas the main crane on the deck vessel Aegir Sealing to Australia.

Lay Mechanical technician

Saipem, china project Liwan and Brazil Project Cernambi
01.2013 - 09.2014
  • Saipem, china and Brazil Saipen New Project Liwan Deep-water Clampin South China Husky oil China Pipe line 22 Special carbon steel, Maintenance the main crane 1.000 t, PLET (Pipe Line End Terminal) and PLEM (Pipe Line End Manifold)check the hydraulic systems Cracat and hydraulic chack, change the cooler HPU HP Line, change directional control valve, flow control valves, actuators, pumps pressure control valve, maintenance equipment Tools Clamshell Cutting Machine, Iluc copper shovers were removing. Rigging up and down with HPUHydraulic pump unitAlloys remove Hydraulic motor JLT Tower and Piston T.C23 Clamp and Hoc Track Safety Clamp. Maintenance all hydraulic systems Saipem FDS 2 vessel Brazil New Project Petrobras cernambi Deep water pipeline 16 Offshore Maintenance Tools Clamshell Cutting Machine, Iluc copper shovers, Bevel machine check Hydraulic hose and fitting Change air filter and oil HPU tower also remove hydraulic motor JLT Tower and hydraulic Pistor. Maintenance all hydraulic systems the crane on the deck. Maintenance the crane JibHer 40 ton hydraulic motor slowing oil filter, a Check visual and check the pressure accumulator, main hoist winch remove the hydraulic motor.

Education

High School Diploma -

Marine Engineering Systems Lloyd's Maritime Institute
Spain
09.2022

Catholic University of Avila
Avila, Madrid
12.2019

High School Diploma -

Joaquin Avellan University Institute ETI
Maracay Venezuela
06.1996

Skills

  • Adapting, Hard worker , People skills
  • Ability to work, under pressure, Self-motivated
  • Highly organized, Imagination, Fast learner
  • Team work, Decommissioning, Power transmission
  • Fluid power, Cooling system, HVAC
  • Marine engineering, Mechanical Engineering, Teamwork and collaboration

Certification

  • OGUK Medical Examination 2026
  • MIST Opito Relyon Nutec 2025
  • Escape chute & Norwegian suit OLF, NSOC-D 2028
  • Medical examination STCW seafarer Norwegian maritime offshore 2026
  • HUET+ EBS+ FOET FMTC 2028
  • CA-EBS Nogeap FMTC 2028
  • CA-EBS Opito FMTC 2028
  • Security Awareness STWC FMTC 2026
  • Offshore forklift truck operator 6767692 FALCK NUTEC 2023
  • FULL GWO Offshore and onshore 2025
  • Rescue team Working at Height offshore Expert 2023
  • Norwegian oil and gas accepted upgrade to the norwegian continental shelf FALCK NUTEC 2022
  • Basic Safety Training STWC FALCK NUTEC 2026
  • Advanced fire fighting STWC FMTC 2026
  • Cherry picker operator IPAF OP 1128532 2020
  • Telehandler Manitou Operator HDW 2020
  • Use of Rescue Equipment level 3 Falck Nutec 2020
  • ECITB Approved Mechanical Joint Integrity Hydraulically Torque and Tensioned stage 2 2023
  • Working at Height and Harne level 2 Falck Nutec 2020
  • Hydrauliek Maritiem and HVAV Maritiem ROVC 2019
  • Banksman and slinger stage 2 OPITO and Rigger competence stage 3 Falck Nutec 2016

Languages

English
Spanish
Portuguese

Timeline

Senior Lay Technician

SUBSEA7
03.2025 - 08.2025

Mechanical Technician

CAPE Holland
02.2025 - 02.2025

Deck Engineer

Seaway 7
01.2025 - 01.2025

Senior Equipment Technician

Boskalis
10.2024 - 12.2024

Comissioning Equipment Engineer

IQIP, France Noimoutier
05.2024 - 09.2024

Senior Equipment Technician

Boskalis
02.2024 - 03.2024

Subsea Equipment Engineer

BOSKALIS
02.2023 - 10.2023

Service equipment Engineer offshore

Mcdermott, Mcdermott
09.2022 - 01.2023

Deck Mechanic foreman

Seaway 7
03.2022 - 08.2022

Shift Leader Lay Deck Mechanic

The offshore partner
10.2020 - 11.2021

Deck Mechanic Foreman

ALLSEAS
12.2014 - 07.2020

Lay Mechanical tech offshore

Huisman crew Ltd
09.2014 - 11.2014

Lay Mechanical technician

Saipem, china project Liwan and Brazil Project Cernambi
01.2013 - 09.2014

High School Diploma -

Marine Engineering Systems Lloyd's Maritime Institute

Catholic University of Avila

High School Diploma -

Joaquin Avellan University Institute ETI
Carlos Manuel De la cabada Hernandez