I'm effective and competent engineer technician with experience in oil and gas exploration, Hydraulics, Marine engineering, Subsea equipment, pipe laying, rig Decommissioning and oil production refining and transportation. Qualified rescue emergency team full GWO and lifting operation LOLER Opito. Adapting very well in various work conditions, Excellent mechanical imagination and highly developed skills. Main features include responsible approach to tasks, strong motivation very good time organization and the ability to work under pressure. IWIND GWO Number D8789505 OPITO Vantage Number 1523914 Highly organized and self-motivated, work well individually and in groups. Proficient with computer literate such as Microsoft word, Microsoft, Excel, Power point and Internet, Programs Scada, Fluid Sim and Simatic 7 siemens PLC TIA portal. AutoCAD Solid work. Able to working independently and under pressure Ability to working, shifts Responsible for other duties as assigned. I've got really people skills, hard worker, love people, I'm a fast learner and I pick up pretty fast.
Experienced with technical troubleshooting, equipment maintenance, and system optimization. Utilizes analytical skills to diagnose issues and implement effective solutions. Track record of ensuring operational efficiency and minimizing downtime through proactive maintenance.
J lay systems on board the vessel seven Borealis
commissioning Replacement pipe work HYD , cylinder, pins, bearing accumulator ,in Angola inspection Draw works, traction winch, A&R Sheaves, Pipe roller guide, Upper and lower line up tool, replace all cylinders and accumulator traveling clamp block, check sensor and logic positioned ,length, inspection and replace the accumulator and cylinder clamp gripper pipe erector, PES winch .HPU testing leak and pressure test all systems, Prepare stinger and roller supports. replace stinger lifting cylinder paired HVAC Main Crane huisman 2400Nitrogentrogen leaking test found the leaking on the condenser part out side control cabin did brazing on pipe cooper repaired, leaking test a Vacuum systems operations after that fill up 6 k gas R 407 , check and repaired Hvac Emerson control room J Lay systems Recovery of gas R 407 C nitrogen leaking test , brazing repaired vacuum systems, put it back gas on system R407C refilled 3 k more until 6k working fine check superheat , subcooling and saturation liquid line and vapor line ok.
Seven champion vessel in KSA project pipeline 42 coating cement o concrete inch shallow water Maintenance A&R winch check 100 ton, MTR scanners check the wires level winder function, Maintenance and E motor. maintenance 2 tensioners 100 ton each check accumulator the clamping cylinder open the crosstie and replaced pads with bolt caterpillar special size, tension the chain according procedure holmatro Adjustment calibrated. adjust the lower and upper tensioners. check and operations the wire stinger winch MTR scanner take back off a socked clean and NDT inspections take back on the socket. check the break positing engaged and disengaged.
installation slew planetary gear box starboard crane, replaced the break Building Hydraulic motor. building and repaired slew planetary gear box change bearing bevel and dowels assemble.
H.P:U repaid leaking pump hoses change return filter and cooling systems. check all pipeline system tv car , lco ,conveyor line up etc.
Improved customer satisfaction with efficient installation and maintenance of equipment. Contributed to team success by collaborating on projects, sharing expertise, and providing support when needed. Maximized productivity by maintaining a clean workspace free from clutter or potential hazards during daily operations. Cleaned around tracks and completed important repairs to achieve maintenance targets.
Project Taiwan Shinfox VLT640
Assemble VLT 640 single from beginning installation suppressor, lock cylinder,check elastomers, Upend cylinder install and flushing , connected all houses LCL,UCI,LCU installed Upend fork, take back on reel and clamp systems sc 12 .installation eccentric gearbox, Prepare the park stand and pile guide to insert the VLT 640 SINGLE.
leaking pressure test and load test therefor all functions clamp gearbox and upend cylinder.
other installation was VLT320 single 4 clamp gearbox suppressor upend cylinder etc according all procedure testing pressure and leak testing HPU test with approved functions movement.
in operation offshore taiwan project .Resolved mechanical issues using both technical and manual skills. Assembled and disassembled equipment to perform repairs and maintenance.
Frequently diagnosed mechanical problems and determined how to correct issues. Maintained clean and organized work area to easily locate repairing tools and equipment.
Vessel Alfa lift TP installation project north sea
Winter installation, repaired and maintenance sea fastening systems TP wind farm project on deck Alfa lift vessel, inspections and NDT clamps services skidding cylinder and clamp cylinder, PM HPU services check and change hydraulic oil filter, Pressure transmitter and temperature sensor, Hydraulic houses changed, check Pressure relief valve and directional valve. Pressure test and leaking test. Function test clamping TP all of them 6 systems on board Alfa lift.
Maintained a clean and orderly work environment, promoting a culture of professionalism among crew members.
Vessel supply Boka Bear noise mitigation system Operation by Hydraulic winch deploy inner and outer ring, connection by compressor flushing, create bubble cutting to installation the monopole seabed wind farm revolution project. Recovery outer ring and inner ring. Maintenance Hydraulic system winch, engine Volvo D13 Diesel, Air compressor unit Offshore, change the filter oil fuel air separator, services receiver drain water change oil. Instalación the equipment connection the hoses 4 inch inlet and outlet.